Table 2 Volcanic ash-induced damage to structures matrix (modified after Daly and Wilkie, 1999 )

From: The genesis of volcanic risk assessment for the Auckland engineering lifelines project: 1996–2000

Structure

Ash thickness <1 mm

Ash thickness 1-5 mm

Ash thickness 5 - 100 mm

Ash thickness >100 mm

Pipework

    

Open systems (ie stormwater)

Low probability

High probability

High probability

High probability

Closed systems

Negligible

Negligible

Negligible

Negligible

Building structures

    

Flat-roof

Low probability

Mod. probability

High probability

High probability

Pitched-roofs (>20°)

Low probability

Mod. probability

High probability

High probability

Building services

    

Air-conditioning

Low probability

Mod. probability

High probability

High probability

Gutters

Low probability

Mod. probability

High probability

High probability

Electricity services

    

Power lines

Negligible

Low probability

Mod. probability

High probability

Power line insulators:

    

Low voltage

Negligible

Mod. probability

High probability

High probability

High voltage

Negligible

Low probability

Mod. probability

High probability

Substations

Negligible

Mod. probability

High probability

High probability

Civil structures

    

Roads

Low probability

High probability

High probability

High probability

Rail

Negligible

Mod. probability

High probability

High probability

Wastewater

    

Sewage pumps

Low probability

High probability

High probability

High probability

Sewage treatment plant

Low probability

Mod. probability

High probability

High probability

Water Supply Systems

    

River/Stream

Low probability

High probability

High probability

High probability

Uncovered reservoir

Low probability

Mod. probability

High probability

High probability

Cover reservoir/ground water

Negligible

Negligible

Negligible

Negligible

Roof-fed tank

Low probability

High probability

High probability

High probability

Telecommunications

    

Lines

Negligible

Low probability

Mod. probability

High probability

Microwave towers

Low probability

Mod. probability

Mod. probability

High probability

Exchange equipment:

    

External air-conditioning

Low probability

High probability

High probability

High probability

Internal Air-conditioning

Negligible

Low probability

Low probability

Low probability

Specific infrastructure

    

Ports

Low probability

High probability

High probability

High probability

Airports: Air transport

Mod. probability

High probability

High probability

High probability