Table 4 Impact states for expected impacts to critical infrastructure as a function of tephra fall thickness. Modified and updated from Wilson et al. (2014)

From: Framework for developing volcanic fragility and vulnerability functions for critical infrastructure

 

Impact State

IS0

IS1

IS2

IS3

 

Description

No damage

Cleaning required

Repair required

Replacement or financially expensive repair

Electrical supply

Threshold (mm)

<3

3–10

10–100

>100

Damage

No damage

Possible abrasion to some moving parts, infiltration of tephra into substation gravel.

Damage to exposed equipment especially those with moving parts, possible electrical line breakage.

Structural damage to some equipment at generation and transmission/distribution sites, irreparable damage to moving parts (e.g., hydro power turbines).

Disruption

No disruption

Temporary disruption to service caused by insulator flashover, cleaning and repair.

Widespread disruption to electrical supply with possible permanent disruption.

Water supply network

Threshold (mm)

<1

1–20

20–100

>100

Damage

No damage

Possible clogging of filters and some abrasion to moving components.

Damage to pumping equipment, other moving parts and infilling of tanks.

Collapse of reservoir roofs and infilling of open reservoirs and tanks.

Disruption

No disruption

Normal operation with increased frequency of filter cleaning and increased turbidity.

Contamination of water and increased treatment required. Possible water use restrictions.

Severe contamination of water supply and exhaustion of supply due to damage and/or increased demand.

Wastewater network

Threshold (mm)

<3

3–10

10–50

>50

Damage

No damage

Possible minor abrasion to pumps, clogging of filters and possible interference with chemical treatment process.

Large amounts of sedimentation in network some causing blockages, some damage to treatment plant components and possible infilling of open tanks.

Widespread sedimentation throughout entire network causing some blockages, irreparable damage to pumps and extensive structural damage to treatment plant components.

Disruption

No disruption

Reduced capacity, operation with increased cleaning of filters.

Temporary disruption to service to unblock network and clean tanks possibly resulting in discharge of untreated sewage.

Long term to possible permanent disruption to service. Unable to treat wastewater.

Airport

Threshold (mm)

<1

1–30

30–150

>150

Damage

No damage

Possible abrasion of runway, apron markings and paved surfaces as a result of clean-up operations.

Moderate abrasion of paved surfaces and landing lights.

Complete burial.

Disruption

Airport open

Airport closure, reduced visibility and traction.

Possible permanent closure.

Road

Threshold (mm)

<1

1–100

100–250

>250

Damage

No damage

Possible increased abrasion of road markings and paved surfaces.

Weak bridges may experience structural damage.

Complete burial, structural damage to some bridges.

Disruption

No disruption

Reduced visibility, loss of traction, covering of markings and possible road closure.

Roads impassable for some vehicles.

Roads impassable if tephra is unconsolidated, compacted tephra may be driven on by some vehicles. Likely road closures.

Rail

Threshold (mm)

<1

1–30

30–150

>150

 

No damage

Possible abrasion and/or corrosion of railway tracks and signals, jamming of mechanical signals and contamination of track ballast.

Complete burial

 

No disruption

Reduced visibility, signals and communications disrupted.

Possible loss of grip and derailing.

Impassable.

Critical components

Threshold (mm)

<1

1–10

10–50

>50

Damage

No damage

No damage

Abrasion of moving parts and blockage of filters.

Extensive damage to most components.

Disruption

No disruption

Reduced function until cleaned

Reduced function and temporary shutdowns until cleaned

Uneconomic to repair, disruption to service until replaced.